Tuesday, December 30, 2025

Upcoming Weather

30-December-2025

Forecast of weather conditions from the National Weather Service for the next several days.   Information is for local area around Teterboro Airport. For more information, please visit their website at: https://www.weather.gov/okx/

                     
                            (Help support Bogota Blog NJ with its coverage of local stories and sports                      
by contributing at Donate to Bogota Blog NJ)




  • Wednesday

    Wednesday: Mostly cloudy, with a high near 33. Wind chill values between 20 and 25. Southwest wind 8 to 11 mph, with gusts as high as 21 mph.

    High: 33 °F

    Mostly Cloudy

  • Wednesday Night

    Wednesday Night: Snow likely, mainly after 1am.  Mostly cloudy, with a low around 25. Southwest wind 6 to 8 mph.  Chance of precipitation is 70%. New snow accumulation of less than a half inch possible.

    Low: 25 °F

    Chance Snow
    then Snow
    Likely

  • New Year's Day

    New Year's Day: Mostly cloudy, then gradually becoming sunny, with a steady temperature around 27. Wind chill values between 15 and 20. Northwest wind 10 to 14 mph, with gusts as high as 26 mph.

    High: 27 °F

    Decreasing
    Clouds

  • Thursday Night

    Thursday Night: Partly cloudy, with a low around 17. West wind around 7 mph.

    Low: 17 °F

    Partly Cloudy

  • Friday

    Friday: Partly sunny, with a high near 32.

    High: 32 °F

    Partly Sunny

  • Friday Night

    Friday Night: Partly cloudy, with a low around 22.

    Low: 22 °F

    Partly Cloudy

  • Saturday

    Saturday: Mostly sunny, with a high near 33.

    High: 33 °F

    Mostly Sunny


Wednesday
Mostly cloudy, with a high near 33. Wind chill values between 20 and 25. Southwest wind 8 to 11 mph, with gusts as high as 21 mph.
Wednesday Night
Snow likely, mainly after 1am. Mostly cloudy, with a low around 25. Southwest wind 6 to 8 mph. Chance of precipitation is 70%. New snow accumulation of less than a half inch possible.
New Year's Day
Mostly cloudy, then gradually becoming sunny, with a steady temperature around 27. Wind chill values between 15 and 20. Northwest wind 10 to 14 mph, with gusts as high as 26 mph.
Thursday Night
Partly cloudy, with a low around 17. West wind around 7 mph.
Friday
Partly sunny, with a high near 32.
Friday Night
Partly cloudy, with a low around 22.
Saturday
Mostly sunny, with a high near 33.
Saturday Night
Partly cloudy, with a low around 21.
Sunday
Mostly sunny, with a high near 34.
Sunday Night
Mostly cloudy, with a low around 24.
Monday
A 30 % chance of snow. Mostly cloudy, with a high near 37.
Monday Night
A chance of rain and snow. Mostly cloudy, with a low around 27. Chance of precipitation is 30%.
Tuesday
Partly sunny, with a high near 36.

#BogotaBlogNJ
#NWS 







             (Help support Bogota Blog NJ with its coverage of local stories and sports by            contributing at Donate to Bogota Blog N

Community Center

 
30-December-2025
 On Wednesday-30-April the Borough of Bogota held a groundbreaking ceremony to start the work on creating a new Community Center in Olsen Park. This will replace the old Recreation Center that served the Borough for many decades. It would become the Bogota Community Center. This was to show that the building will be used by all residents of the Borough.
 The Community Center will be a one-story structure that will house a main multi-purpose room having a Junior Varsity size Basketball Court. This room will also be used for Summer Camp, along with Student and Adult programs. There will also be a separate meeting room, a new directors office, and storage rooms for equipment. A new snack bar will be created that can serve both indoor events and offer food service to the park. Public restrooms will be accessible during regular park hours. At this time, an opening of April 2026 is planned.
 In May the demolition of the old building began, and the site was cleared by the end of the month. During this time, a number of old glass bottles and other artifacts were found. The Borough is interested  in saving them as part of the history of the site.
 In July, the site was marked and prepared  for foundation work. The building subsurface foundations, plumbing, electrical and other utility conduits, and piping had been completed. Then the geostorage system for stormwater runoff was installed underground and covered. Later in July the outline of the structure had been poured showing the shape of the new building.
 In early August, the main slab on grade was poured and levelled. Once the concrete was fully cured the structural steel began to be erected. At the start of September columns were placed and trusswork for the gym’s and office roofs were hung.
 Before the end of the month concrete blocks for the gym, and metal framing studs for the lower section of the building were installed. Along with metal roofing to begin the enclosing of the interior
 In October, the lower level was able to be drywalled with opening cuts for doors and windows. This  made the work to enclose the building, and continue with interior framing installing ductwork, insulation, sprinklers, and starting drywall installation. On the exterior, the splitface block on the lower portion of the building is completed. The metal paneling which encompasses the upper gym wall is completed on the rear and currently making its way around to the front face of the building. The main entrances on the office side of the building will have a wood finish cladding system once those areas are ready.
 Recently doors and windows were installed, Fascia on the upper walls of the gym and detailing for the W. Main St, and park facing entrances. As the year turned into Winter, decorative panels were added to the western door  towards  Olsen Park. Bollards have been added around the deck that will become an outdoor sitting area in front of the refreshment stand. Before the cold weather set-in a few concrete curbs were poured to designate the parking area.
 With the building being weatherproof all interior work is taking place in the whole structure. Landscaping is scheduled for May 2026.
 
 
                  (Help support Bogota Blog NJ with its coverage of local stories and sports by              
                                              
    contributing at Donate to Bogota Blog NJ)






















                      (Help support Bogota Blog NJ with its coverage of local stories and sports by              
                                              
              contributing at Donate to Bogota Blog NJ)

Monday, December 29, 2025

Bogota Board of Education

 
29-December-2025
 On Tuesday-16-December, the Bogota Board of Education held their final meeting for the year of 2025.
 During his Superintendent reports Mr. Damian Kennedy first asked Student Representative Ms. Ximena Vargas to give her report. Ms. Vargas talked about the beginning of the 2025-26 varsity Sports season. She also said that a number of Seniors have received acceptance letters from Post Secondary institutions. With two Seniors signing Commitment letters.
 Then Superintendent Kennedy said that the High School Media Center is undergoing refurbishment. It has a schedule re-opening in April of 2026.
 Next Superintendent Kennedy asked Mr. Wilcox to present the Financial Audit for the past year. It was reported, for the second straight year, the District had no adverse findings. This included that the District is in sound financial conditions and has a strong maintenance reserve if needed.
 Then the Trustees voted on the Consent Agenda. All resolutions were passed by unanimous vote. Items of note were.
-to accept donations for the equipment to be used in the Career Technical Education Building.
-approved the use of district property for sport practices with facility fees
 The next Board of Education meeting will be on Tuesday-6-January 2026 at 7:00p. This will include the swearing-in for Ms. Idalia Alvarez, Ms. Trina Olivo and Ms. Ambreen Naeem who won the position of Trustees for the Board of Education in the 2025 General Election.
This will be held in the High School Cafeteria located on the second floor of 2 Henry Luthin Pl. and online.
  Videos of this, and other Board of Education meetings can be seen at:
https://www.bogotaboe.com/Page/2145

 
 (To help support Bogota Blog NJ with its coverage of Local stories & sports
 please contribute at:  donate to Bogota Blog NJ)












 
 (To help support Bogota Blog NJ with its coverage of Local stories & sports
 please contribute at:  donate to Bogota Blog NJ)